Val-Co
Home » Docs » Line Height Management

Line Height Management

The two most important procedures for the Roaster Nipple are (1) height of drinker from the floor in relation to the bird and (2) amount of pressure in the system (water height in the standpipe). Both of these procedures must change during the growout cycle. The following instructions detail the various changes of the cycle. Drinker Height Illustration
  1. The first two days the chick should reach the trigger pin at about a 30-45° angle.
  2. Raise the drinker with the winching system so that the next 5 days the chicks are reaching the trigger pin at about a 60° angle.
  3. Check every 2-3 days thru the balance of the growout and raise the drinker if needed so that the birds are reaching at about a 70-80° angle approach to the bottom of the trigger pin.


Knowledgebase Docs

Article
Description
Info Sheets List of Sell Sheets and other documents.
Manuals All Manuals
Water Facts Important Water Facts
Line Height Line Height Management
Clean Drinkers Cleaning the drinkers
Cleaning Lines Cleaning Water Lines
Flushing Line Flushing Procedure
Flushing New Line Flushing Procedure [RFV160]
Flush Filter How to Flush the Filter (VF122)
Reg. Manage Regulator Management
Management Broiler Management Procedures
Vaccination Vaccination Procedure
VR202 Parts Regulator Kit Parts List
VR205 Parts Regulator (VR205) Kit Parts List
Replace Filter Replace Filter Cartridge (VM121)
Chemicals Chemical Resistance List

For all these tips in one book, download these PDFs: